Installed cost of Envirokerb 5x10 in comparison to a concrete equivalent.

Note that the figures reproduced on the cost comparitive chart have been estimated after discussions with the contractors laying the largest number of units.

Smaller schemes show an even larger cost benefit to the Envirokerb product.

We are aware that the lifting machine or device has usually been purchased by the user but it needs to be costed against each scheme. There would normally be a digger incorporated into the lifting machine. This would require an extra operative. This must also be costed.

The figures show that there are similar costs for the majority of the installation process. Concrete surround and number of operatives is very similar.

It must be noted that the hidden cost, or on-going cost of back injuries, days of sickness and any other risks must be taken into consideration when calculating installation costs. We would also be interested in your individual costings.

The figures on this chart can be altered automatically changing the calculated figures.

Please insert your own figures for your particular scheme.
Be honest and consider all the real costs associated with laying concrete kerbs.Note that any product over 25kg should not be repeatedly installed by manual means.

If you have any questions please call us as we will be more than happy to assist you.

ENVIROKERB 5X10 REPLACEMENT TRADITIONAL CONCRETE KERBS
QUANTITY TO BE INSTALLED
Quantity installed in units
 
PURCHASE PRICE OF PRODUCT
Purchase price including delivery
Per Unit £8.25 £3.00
 
KERB-RACE AND HAUNCH COST
Cost/cube of concrete
Cost of concrete per unit kerb
Per unit £4.00 £4.00
 
LABOUR FOR INSTALLATION
Cost per man per day
Number of men required
Volume per day installed safely
Per unit £0.60 £2.25
 
USE OF MECHANICAL LIFTER PER DAY
Cost per day for lifter £0.00
Volume laid per day/machine £0.00
Per unit £0.00 £1.25
 
JCB AND DRIVER
Cost of driver per day
Cost of machine per day
Per unit £0.42 £1.05
 
TRAFFIC MANAGEMENT
Per unit installed
 
INSTALLED COST PER UNIT EXCLUDING BREAKAGE
Total cost per unit laid £13.77 £12.55
Percentage of breakage 0% %
 
FULL COST PER UNIT INSTALLED £13.77 £13.80
 
COST PER LIN METRE £15.07 £15.10