Skip content

Hydrobus
Transport for London had a Bus Stop close to Seven Sisters Tube Station that was causing problems with flooding. The designer spoke to PDS about the possibility of incorporating a kerb drainage product for bus stops in any maintenance work. But because the kerb line was directly on top of the London Underground 'Roof', there was a restriction of depth that meant that the Envirokerb Bus Stop kerbs were too deep within the surfacing. Therefore a specific Combined Bus Stop and Drainage Kerb was designed exactly to suit TfL requirements.
Back to case studies