A66 Surtees Bridge, Stockton
In 2007 PDS completed the supply of both our Hydrodeck Bridge Drainage System and Dri-Deck Sub-surface Drainage System to Edmund Nuttall Ltd.
We carried out a value engineering exercise on the project reducing the specified bridge drainage unit widths which saved costs and weight to the structure.
The Dri-Deck system was re-designed to maximize sub surface water collection at critical points of the bridge and PDS designed and supplied all below deck pipe-work inc Expansion joint bellows and pipe hanger systems as part of a complete drainage package.