Case Study - Bridge Drainage

HydroDeck

Boyne Bridge, Ireland

PDS supplied all the Bridge Drainage Products for this prestigious contract in Ireland.

All ductile iron pipe work was also procured at the same time. The design was complicated and our expertise in all drainage materials meant that the contract ran smoothly with no delays to the programme. Bridge Engineer Bob Towell was impressed with the depth of knowledge within the team at PDS and commented on how we had helped in all aspects of drainage design problems.

For more information on the Boyne Bridge project please click here.

Back to case studies

Boyne Bridge

Boyne Bridge

PDS Video Player

CE Accrediation

PDS Product