Upper Forth Crossing, Kindcardine

Upper Forth

The new crossing at Kincardine is now complete. PDS after having a major input into the drainage design supplied over 5000 No Envirodeck units to this new impressive structure.
PDS visited the site in July to have a look at this very prestigious project. Chris Rothery, Managing Director said; "We worked hard on this contract and had a big input into the drainage design, working closely with the designers and the contractor. It is a fantastic project and we are proud that our new Envirodeck was Selected for the crossing over traditional systems."

"When you see the units being installed the health and safety benefits are clear over our older metallic products and from a visual point of view the quality of the system is obvious. We are now receiving enquiries for our Envirodeck product for Europe and we will be pushing to develop the overseas market".

Click below to view site photographs

[1] [2] [3] [4] [5] [6] [7] [8] [9] [10] [11]

Back to case studies

 
Video Case Studies. System requirements: Flash + Javascript