Leeds Inner Ring Road
More and more we are finding that we are supplying contracts with two to three of our products. The Leeds Inner Ring Road is another project that shows why this benefits both the contractor, client and of course the supplier. This project has removed traditional concrete kerb drains and replaced them with our Envirokerb lightweight Road Drainage, and was also one of the first schemes to utilise the Envirodeck Bridge Drainage System.
The contractor, Alfred Mcalpine saw the benefit of using lightweight, non- metallic and strong drainage systems rather than using heavy, brittle and large concrete drainage products. The Envirokerb gave them the added benefit of increasing the amount of 100% recycled products used on the scheme. The savings by "value engineering" the design has proven to be very worthwhile for AM who have now purchased these products on numerous other schemes. AM take the Health & Safety and their environmental responsibilities very seriously indeed.